Deputy Coordinator of a Major Horizon Europe Project
il y a 5 jours
SuperGrid Institute brings together 180 employees of 28 different nationalities who work together within a dynamic environment in the city of Lyon. As an independent research and innovation centre, we are dedicated to developing technologies for the future power transmission system, the “SuperGrid”, including HVDC & MVDC technologies.
General Context
Integration of large amount of renewable energy sources (RES) (e.g., offshore wind, PV) and energy market integration are two of the main drivers for the future development of the pan-European power grid. This will require a reinforcement of the transmission grid to make it able to transport large amount of power over long distances from generation areas to load areas. Extended High-Voltage Direct Current (HVDC) grids, in Point to point or Multi-Terminal (MTDC) configuration covering large areas and distances, are considered to be the preferable solution for the reinforcement of the grid. Indeed, it has been understood that MTDC grids based on voltage source converter (VSC) technology are a key development for harnessing the offshore wind production potential of the North Seas. Those systems will be evolving from simple point to point and radial structures to complex meshed ones. To achieve their development, it is necessary to enhance their operating procedures with major challenges in control and protection, while considering the interoperability aspect of multi vendors MTDC grids.
**Position Context**
Achieving multi-vendor multi-terminal HVDC interoperability is identified as a key target by the European Commission. The Horizon Europe InterOPERA project proposal is a unique initiative to define and validate the appropriate HVDC Interoperability frameworks, through the development of a Demonstrator. It encompasses functional design and specification frameworks, control and protection subsystems integration test frameworks, cooperation frameworks, procurement frameworks. The Demonstrator development consists of the specification, engineering development and HIL (Hardware-In-the-Loop) integration test of the full control system of a multi-terminal HVDC grid with sub-systems provided by at least three HVDC manufacturers. This is a four-year project gathering N partners (Transmission System Operators, Off-Shore Wind developpers, HVDC converter manufacturers, Off-shore wind turbine manufacturers,), and a budget that exceeds 50M€.
Being the InterOPERA project coordinator, and considering the project size and complexity, SuperGrid Institute is looking for a Project Deputy Coordinator. Differently from many Horizon Europe’ type project, which are quite research-oriented, it is anticipated that InterOPERA project will face tough decision-making /negotiation. Moreover, the project requires to firmly coordinate different activities with significant interdependencies, and not loose time due to planning uncertainties or technical misalignment.
**Objectives / Missions**
As the InterOPERA project deputy coordinator, your mission is to assist the project coordinator in all his/her duties, and to act as the project coordinator in case of his/her absence.
Besides this first role, you can also be appointed as project manager on few other projects whether they are collaborative projects or customer projects. Project size typically ranges from few months to few years and from 100k€ to 1M€.
Horizon Europe project coordinator duties:
- To handle the communication with the EU Commission Project Officer
- To coordinate the Grant Agreement process and its potential future Amendments
- To coordinate the reporting process to the EU Commission
- To coordinate the administrative and financial management
- To organize and run the project governance
- To manage project risks
- To coordinate project quality plan
- To establish collaborative work environment
- To ensure effective collaboration between the project consortium members
- To ensure effective internal communication and external dissemination
- To ensure effective technical coordination between relevant WPs and Tasks
- To coordinate negotiations with consortium members, to make optimal decisions and achieve project objectives
- To coordinate project planning activities, milestones anticipation and achievement
Project manager role for customer projects:
- To contribute to technical offer preparation
- To ensure project execution according to contractual offer
- To handle the communication with the customer during the project execution
- To understand customer expectations, and optimize their fulfilment through adequate project management
- To manage project resources and team
- To ensure project deliverables quality
- To manage project financial reporting
Engineering degree (Master 2).
Experience in the field of complex technical and industrial project coordination.
Experience in the power system industry. Focus on HVDC systems and/or wind farms will be appreciated.
Prior experience in European projects (
-
Engineer Mtdc Control
il y a 5 jours
Villeurbanne, France SuperGrid Institute Temps pleinEstablished in 2014, SuperGrid Institute is an independent private company with over 150 employees of 21 different nationalities. The institute is a key player for energy transition in France and throughout Europe, specialising in innovative high and medium voltage direct current (HVDC and MVDC) power systems. SuperGrid Institute also develops new...
-
Engineer Mtdc Control
il y a 5 jours
Villeurbanne, France SuperGrid Institute Temps pleinSuperGrid Institute brings together 180 employees of 28 different nationalities who work together within a dynamic environment in the city of Lyon. As an independent research and innovation centre, we are dedicated to developing technologies for the future power transmission system, the “SuperGrid”, including HVDC & MVDC technologies. General...
-
Villeurbanne, France Technip Energies Abu Dhabi Temps pleinJOB DESCRIPTIONBe part of the solution at Technip Energies and embark on a one-of-a-kind journey. You will be helping to develop cutting-edge solutions to solve real-world energy problems.About us:Technip Energies is a global technology and engineering powerhouse. With leadership position in LNG, hydrogen, ethylene, sustainable chemistry, and CO2 management,...
-
Internship – 3D synthesis phase of a life sciences project F/M
il y a 1 semaine
Villeurbanne, Auvergne-Rhône-Alpes, France Technip Energies Temps pleinJob DescriptionBe part of the solution at Technip Energies and embark on a one-of-a-kind journey. You will be helping to develop cutting-edge solutions to solve real-world energy problems.About us:Technip Energies is a global technology and engineering powerhouse. With leadership position in LNG, hydrogen, ethylene, sustainable chemistry, and CO2 management,...
-
Villeurbanne, Auvergne-Rhône-Alpes, France Genesis Temps pleinDescriptionBe part of the solution at Technip Energies and embark on a one-of-a-kind journey. You will be helping to develop cutting-edge solutions to solve real-world energy problems.About us:Technip Energies is a global technology and engineering powerhouse. With leadership position in LNG, hydrogen, ethylene, sustainable chemistry, and CO2 management, we...
-
Project Portfolio Manager
il y a 5 jours
Villeurbanne, France HM CLAUSE Temps plein**Type de contrat**: CDI **Temps de travail**: Temps complet **Famille de métier**: GENERAL MANAGEMENT - GENERAL MANAGEMENT **Finalité du poste**: HM.CLAUSE is recruiting a **Project Portfolio Manager** who report directly to the CEO. The position is based in Portes-Lès-Valence, at the head office. You provide high-level operational support to CEO...
-
Senior Hvdc Project Controller
il y a 3 jours
Villeurbanne, France GE Vernova Temps plein**Job Description Summary**: Become part of a winning team and help to deliver the Green Energy transition. We are looking for an experienced Planning professional to join our Project Controls team delivering a HVDC project. In Project Controls, our goal is to provide the right insights and recommendations to influence the execution of the projects and...
-
Senior Project Manager
il y a 7 jours
Villeurbanne, Auvergne-Rhône-Alpes, France GE Vernova Temps pleinJob Description SummaryLead or be part of a Large & Complex Full Turnkey HVDC or AC Systems on-shore and/or off-shore project including Design, Supply, Construction, Electro-mechanical Installation and Testing & Commissioning works. Managing the Project team comprising of Project Management and other functions (Engineering, Project Cost Control, Finance,...
-
Service Coordinator
il y a 5 jours
Villeurbanne, France MSA Safety Temps pleinOverview: Perform usual Service coordination tasks, handle Service cases “from A to Z”, support Service Customers. **Responsibilities**: - % of Time Major Responsibilities 50% 1. **_ Support Customers for their after Sales needs on MSA Products in France_** 1.1 Acknowledge and handle Customers’ requests and claims- 1.2 Prepare offers for one/off...
-
Project Manager ECC
il y a 2 semaines
Villeurbanne, Auvergne-Rhône-Alpes, France Energy Job Search Temps pleinCompany DescriptionOur MissionBoccard was built on itshistorical expertisein industrialpipingandboiler-making. It has enabled us to evolve into anindustrial integrator, capable ofdesigning, building, commissioning, and maintainingcomplete production units.Boccard designs and delivers complete installations along with the intelligence that powers them...