Chef de Chantier
Enregistrez cette offre et organisez votre recherche
Créez un compte gratuit pour enregistrer des offres d'emploi, créer des alertes et revenir à cette liste depuis votre tableau de bord.
En continuant, vous acceptez nos Conditions d’utilisation & Politique de confidentialité.
Welcome to the future of nuclear energy, where Westinghouse Electric Company is leading the field with expertise and innovation to shape the power of tomorrow. At Westinghouse, innovation is in our DNA. We are creative. We think differently. We reimagine the possible across the nuclear industry every day.
Operational Site Manager – Site Manager
The site manager is a recognized professional in the technique implemented.
General Expectations
- Have the delegation of authority regarding safety and working hours for the site for which you are responsible
- Manage the implementation teams. You can in some cases rely on a team of middle managers for managing the teams on duty, the equipment and the consumables.
- Ensure that activities run smoothly following quality, safety and planning goals
- Conduct regular field visits and lead safety discussions
- Ensure the monitoring of the activities of subcontractors following applicable procedures
- Immediately alert OCC and your hierarchy in the event of a safety, environment, radiation protection and equipment event impacting the intervention schedule
- Manage risks and anticipate them (48-hour vision)
- Ensure the management of contingency resolution plans together with the back-office teams
- Communicate on the progress of the implementation schedule with the Project Manager and the Operations Manager
- Communicate all requests for changes to resources/organizational charts to the Operations Manager, Project Manager and Resource Planning
- Communicate any changes compared to the initial order to the Project Manager and the Operations Manager
- Communicate the ESS scoring instructions and the weekly report of attachments to the Project Manager for validation
- Are responsible for the consistency and validation of subcontractor paper attachments and forward them to the Project Manager for validation
- Ensure the systematic opening of observation sheets in the event of waiting time and respect the CNPE validation process
- Report all disputes relating to waiting hours/overtime
- Are responsible for site preparation (interlocking meeting, equipment logistics)
- Ensure the systematic and regular collection of the REX elements of the intervention following the WEF 3.1.2 procedure
You are responsible for the following deliverables:
PREPARATION
- Take ownership of the planned cost (AS) version and build the cost forecast (AP) with the Project Manager
- Prepare and participate in the Challenge Review (CR)
- Ensure the link with the EDF site project manager and integrate into the milestones of the modular preparation following the contractual commitments
- Communicate to your operational manager and Project Manager a request for resources with an associated mobilization schedule
- Communicate and technically validate the intervention schedule
- Ensure the availability and validity of equipment and consumables before the intervention
- Ensure that the RTRs are properly prepared and that the dosimetric issues on the site are controlled. Participate, if necessary, in ALARA committees to ensure the application of PR countermeasures
- Ensure that the operational REX and the countermeasures defined in the ADR or mentioned in the REX sheets are properly taken into account by the stakeholders
- Communicate with the DRT BPE website
- Create the organizational chart and ensure the validity and consistency of the qualifications of the mobilized personnel
- Communicate to the Planning Department the mission orders/access of the responders in compliance with the Westinghouse notice-period rules in force
- Prepare and sign the delegation of authority for the site
- Conduct and lead the safety welcome meeting for your site at the beginning of the intervention to present the issues/specificities of the site
- Ensure legal signage in the workplace
REALIZATION
- Transmit deliverables to the customer (activity report, daily schedule, validated report sheets)
- Daily transmission of the OCC report
- Transmit all report sheets, non-conformities, customer monitoring sheets, and waiting reports opened during the operation (on the network)
- Maintain a daily summary table including details of the basic order, additional work and waiting reports communicated to EDF, and transmit it to your manager or Project Manager when required
- Ensure the implementation of reliability tools in reflex mode by your teams
- Record deviations or ensure they are recorded following applicable procedures
- Carry out or ensure daily visits to the area to validate the proper conduct of the site (cleanliness, safety)
- In the event of a hazard (technical, safety), alert your